Solar Farm

Muirmealing Solar Farm

Muirmealing Shaw, Saline, Dunfermline, Fife, KY12 9UB

Muirmealing Solar Farm is a 5 MW solar farm project in Scotland. The applicant or operator on record is Muirmealing Solar Ltd (The Abbey Group). The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 15/02993/FULL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-11-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Muirmealing Solar Farm is a 5 MW solar farm project in Scotland. The applicant or operator on record is Muirmealing Solar Ltd (The Abbey Group). The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 15/02993/FULL.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMuirmealing Solar Ltd (The Abbey Group)
Owner / operatorMuirmealing Solar Ltd (The Abbey Group)
Year consented2016
LocationMuirmealing Shaw, Saline, Dunfermline, Fife, KY12 9UB
RegionScotland
Coordinates56.1167462Β°N, 3.6125937Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)108000

πŸ“… Project Timeline

2015-08-21
2016-11-11