Solar Farm

Muchalls Jnct, Muchalls - Solar Photovoltaic Array

Nw/O A92 Muchalls Jnct, Muchalls, Newtonhill, Stonehaven, Aberdeenshire, AB39 3PZ

Muchalls Jnct, Muchalls - Solar Photovoltaic Array is a 6.1 MW solar farm project in Scotland. The applicant or operator on record is Decerna Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Aberdeenshire, reference APP/2025/0874.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2025-12-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.100 MW
Registered Capacity

πŸ“‹ Project Overview

Muchalls Jnct, Muchalls - Solar Photovoltaic Array is a 6.1 MW solar farm project in Scotland. The applicant or operator on record is Decerna Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Aberdeenshire, reference APP/2025/0874.

Site Schematic

SUBSTATION ? ha Β· 6.1 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)6.100 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperDecerna Limited
Owner / operatorDecerna Limited
LocationNw/O A92 Muchalls Jnct, Muchalls, Newtonhill, Stonehaven, Aberdeenshire, AB39 3PZ
RegionScotland
Coordinates57.0320454Β°N, 2.1501202Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)104000

πŸ“… Project Timeline

2025-06-20