Mowcroft Solar Farm is a 27.15 MW solar farm project in North West. The applicant or operator on record is Renewable Connections Developments Limited. The planning application was refused. The determining authority is Warrington, reference 2025/00961/FULM.β¦
Refused
Project stageRefused
PlanningJul 2025 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-12-09.
Registered planning capacity; not measured generation.
Mowcroft Solar Farm is a 27.15 MW solar farm project in North West. The applicant or operator on record is Renewable Connections Developments Limited. The planning application was refused. The determining authority is Warrington, reference 2025/00961/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.