Mount Pleasant Farm, Mount Pleasant Farm Lane, Horpit, Swindon, Wiltshire, SN4 0AU
Mount Pleasant Farm - Solar Farm is a 35 MW solar farm project in South West. The applicant or operator on record is Belltown Power Limited. The scheme is currently in the planning system, submitted June 2025. The determining authority is Swindon, reference S/25/0666.β¦
In Planning
Project stageIn planning
PlanningJun 2025 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-07-25.
Registered planning capacity; not measured generation.
Mount Pleasant Farm - Solar Farm is a 35 MW solar farm project in South West. The applicant or operator on record is Belltown Power Limited. The scheme is currently in the planning system, submitted June 2025. The determining authority is Swindon, reference S/25/0666.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
35.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Belltown Power Limited
Owner / operator
Belltown Power Limited
Location
Mount Pleasant Farm, Mount Pleasant Farm Lane, Horpit, Swindon, Wiltshire, SN4 0AU