Land At To The West Of Chemical Works, Mossmorran,, Fife
Mossmorran Wind Farm is a 6 MW onshore wind project in Scotland. The applicant or operator on record is Airvolution Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 12/02692/FULL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2012 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2014-02-20.
Registered planning capacity; not measured generation.
Mossmorran Wind Farm is a 6 MW onshore wind project in Scotland. The applicant or operator on record is Airvolution Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 12/02692/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Airvolution Energy
Owner / operator
Airvolution Energy
Location
Land At To The West Of Chemical Works, Mossmorran,, Fife