Morfa Pingett Solar Farm, Pembrey, Burry Port, Dyfed, SA16 0JE
Morfa Pingett Solar Farm is a 1.6 MW solar farm project in Wales. The applicant or operator on record is Richard Thomas and Co (Hydro) Limited. The planning application was refused. The determining authority is Carmarthenshire, reference PL/02407.β¦
Refused
Project stageRefused
PlanningAug 2021 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2021-12-10.
Registered planning capacity; not measured generation.
Morfa Pingett Solar Farm is a 1.6 MW solar farm project in Wales. The applicant or operator on record is Richard Thomas and Co (Hydro) Limited. The planning application was refused. The determining authority is Carmarthenshire, reference PL/02407.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Richard Thomas and Co (Hydro) Limited
Owner / operator
Richard Thomas and Co (Hydro) Limited
Location
Morfa Pingett Solar Farm, Pembrey, Burry Port, Dyfed, SA16 0JE