πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Moorland Engineering Works, Lower Railway Road - Solar Panels

Moorland Engineering Works Lower Railway Road, West Yorkshire, LS29 8JB

Moorland Engineering Works, Lower Railway Road - Solar Panels is a 0.28 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Spooner Industries Limited. Planning permission has been granted as of June 2025 and it is awaiting construction. The dete…

Consented / Approved
Project stageConsented
  1. PlanningApr 2025 (completed)
  2. ConsentedJun 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-06-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.280 MW
Registered Capacity

πŸ“‹ Project Overview

Moorland Engineering Works, Lower Railway Road - Solar Panels is a 0.28 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Spooner Industries Limited. Planning permission has been granted as of June 2025 and it is awaiting construction. The determining authority is Bradford, reference 25/01480/PNP.

Site Schematic

SUBSTATION ? ha Β· 0.28 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.280 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSpooner Industries Limited
Owner / operatorSpooner Industries Limited
Year consented2025
LocationMoorland Engineering Works Lower Railway Road, West Yorkshire, LS29 8JB
RegionYorkshire and Humber
Coordinates53.9250981Β°N, 1.8120975Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-04-11
2025-06-06