Moonraker Farm, Gastard - Solar Panels is a 0.25 MW solar farm project in South West. The applicant or operator on record is Moonraker Farm. The scheme is currently in the planning system, submitted December 2022. The determining authority is Wiltshire, reference PL/2022/09590.β¦
Revised
Project stageSuperseded by a new application
PlanningDec 2022 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2023-05-03.
Registered planning capacity; not measured generation.
Moonraker Farm, Gastard - Solar Panels is a 0.25 MW solar farm project in South West. The applicant or operator on record is Moonraker Farm. The scheme is currently in the planning system, submitted December 2022. The determining authority is Wiltshire, reference PL/2022/09590.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.