Solar Farm

Moat Farm, Whetsted Road - Solar Panels

Moat Farm Whetsted Road Five Oak Green Tonbridge, Kent, TN12 6RR

Moat Farm, Whetsted Road - Solar Panels is a 0.27 MW solar farm project in South East. The applicant or operator on record is Adrian Scripps Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Tunbridge …

Consented / Approved
0 MW
Installed Capacity

πŸ“‹ Project Overview

Moat Farm, Whetsted Road - Solar Panels is a 0.27 MW solar farm project in South East. The applicant or operator on record is Adrian Scripps Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Tunbridge Wells, reference 23/01812/PN14J.

Site Schematic

SUBSTATION ? ha Β· 0.27 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAdrian Scripps Limited
Owner / operatorAdrian Scripps Limited
Year consented2023
LocationMoat Farm Whetsted Road Five Oak Green Tonbridge, Kent, TN12 6RR
RegionSouth East
Coordinates51.1891907Β°N, 0.3540855Β°E