πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Mitcham Eco Park (Waste AD)

Benedict Wharf Off Hallowfield Way, Mitcham,, London, CR4 5BQ

Mitcham Eco Park (Waste AD) is a 6.2 MW bioenergy / waste project in London. The applicant or operator on record is SITA UK. The application has been withdrawn or the scheme abandoned. The determining authority is Merton, reference 08/P2724.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-07-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.200 MW
Registered Capacity

πŸ“‹ Project Overview

Mitcham Eco Park (Waste AD) is a 6.2 MW bioenergy / waste project in London. The applicant or operator on record is SITA UK. The application has been withdrawn or the scheme abandoned. The determining authority is Merton, reference 08/P2724.

πŸ”§ Technical Specifications

Capacity (MW)6.200 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSITA UK
Owner / operatorSITA UK
Year consented2011
LocationBenedict Wharf Off Hallowfield Way, Mitcham,, London, CR4 5BQ
RegionLondon
Coordinates51.3996453Β°N, 0.1748253Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2008-10-16
2011-10-12