Misterton PSD, Stockwith Road - Solar Panels is a 0.42 MW solar farm project in East Midlands. The applicant or operator on record is Exolum. Planning permission has been granted as of February 2024 and it is awaiting construction. The determining authority is Bassetlaw, referencβ¦
Consented / Approved
Project stageConsented
PlanningDec 2023 (completed)
ConsentedFeb 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2024-03-04.
Registered planning capacity; not measured generation.
Misterton PSD, Stockwith Road - Solar Panels is a 0.42 MW solar farm project in East Midlands. The applicant or operator on record is Exolum. Planning permission has been granted as of February 2024 and it is awaiting construction. The determining authority is Bassetlaw, reference 23/01500/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.