Solar Farm

Misterton PSD, Stockwith Road - Solar Panels

Misterton Petroleum Storage Depot Stockwith Road Walkeringham, Nottinghamshire, DN10 4JG

Misterton PSD, Stockwith Road - Solar Panels is a 0.42 MW solar farm project in East Midlands. The applicant or operator on record is Exolum. Planning permission has been granted as of February 2024 and it is awaiting construction. The determining authority is Bassetlaw, referenc…

Consented / Approved
Project stageConsented
  1. PlanningDec 2023 (completed)
  2. ConsentedFeb 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-03-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.420 MW
Registered Capacity

πŸ“‹ Project Overview

Misterton PSD, Stockwith Road - Solar Panels is a 0.42 MW solar farm project in East Midlands. The applicant or operator on record is Exolum. Planning permission has been granted as of February 2024 and it is awaiting construction. The determining authority is Bassetlaw, reference 23/01500/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.42 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.420 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperExolum
Owner / operatorExolum
Year consented2024
LocationMisterton Petroleum Storage Depot Stockwith Road Walkeringham, Nottinghamshire, DN10 4JG
RegionEast Midlands
Coordinates53.4281701Β°N, 0.8344294Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)9841

πŸ“… Project Timeline

2023-12-12
2024-02-23