Land North of Minety Substation Minety, Wiltshire, SN16 9RP
Minety North is a 49.99 MW battery storage project in South West. The applicant or operator on record is Statera Energy / Minety North Storage. The application has been withdrawn or the scheme abandoned. The determining authority is Wiltshire, reference 17/03936/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMay 2017 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2022-09-13.
Registered planning capacity; not measured generation.
Minety North is a 49.99 MW battery storage project in South West. The applicant or operator on record is Statera Energy / Minety North Storage. The application has been withdrawn or the scheme abandoned. The determining authority is Wiltshire, reference 17/03936/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.990 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Statera Energy / Minety North Storage
Owner / operator
Statera Energy / Minety North Storage
Location
Land North of Minety Substation Minety, Wiltshire, SN16 9RP