πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Milton Park, Milton - Solar Panels

172 Brook Drive, Milton Park, Milton, Abingdon, Oxfordshire, OX14 4SD

Milton Park, Milton - Solar Panels is a 0.3 MW solar farm project in South East. The applicant or operator on record is Crowcon Detection Instruments Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is Vale …

Consented / Approved
Project stageConsented
  1. PlanningFeb 2025 (completed)
  2. ConsentedMar 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-06-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.300 MW
Registered Capacity

πŸ“‹ Project Overview

Milton Park, Milton - Solar Panels is a 0.3 MW solar farm project in South East. The applicant or operator on record is Crowcon Detection Instruments Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is Vale of White Horse, reference P25/V0245/N8A.

Site Schematic

SUBSTATION ? ha Β· 0.3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperCrowcon Detection Instruments Limited
Owner / operatorCrowcon Detection Instruments Limited
Year consented2025
Location172 Brook Drive, Milton Park, Milton, Abingdon, Oxfordshire, OX14 4SD
RegionSouth East
Coordinates51.6245474Β°N, 1.2844302Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-02-05