Micheldever Rail Sidings EFW is a 2 MW renewable energy project in South East. The applicant or operator on record is Clean Power Properties & Network Rail Infrastructure. The application has been withdrawn or the scheme abandoned. The determining authority is Winchester, referen…

Withdrawn
2 MW
Installed Capacity

πŸ“‹ Project Overview

Micheldever Rail Sidings EFW is a 2 MW renewable energy project in South East. The applicant or operator on record is Clean Power Properties & Network Rail Infrastructure. The application has been withdrawn or the scheme abandoned. The determining authority is Winchester, reference 12/02013/HCS.

πŸ”§ Technical Specifications

Capacity (MW)2 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperClean Power Properties & Network Rail Infrastructure
Owner / operatorClean Power Properties & Network Rail Infrastructure