πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Metrolink Trafford Depot - Solar Panels & Battery Storage

Metrolink Trafford Depot, Warwick Road South, Stretford, Manchester, Greater Manchester, M16 0GZ

Metrolink Trafford Depot - Solar Panels & Battery Storage is a 0.26 MW solar farm project in North West. The applicant or operator on record is Briar. The planning application was refused. The determining authority is Trafford, reference 104663/PRJ/21.…

Refused
Project stageRefused
  1. PlanningMay 2021 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2021-12-07.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.260 MW
Registered Capacity

πŸ“‹ Project Overview

Metrolink Trafford Depot - Solar Panels & Battery Storage is a 0.26 MW solar farm project in North West. The applicant or operator on record is Briar. The planning application was refused. The determining authority is Trafford, reference 104663/PRJ/21.

Site Schematic

SUBSTATION ? ha Β· 0.26 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.260 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBriar
Owner / operatorBriar
LocationMetrolink Trafford Depot, Warwick Road South, Stretford, Manchester, Greater Manchester, M16 0GZ
RegionNorth West
Coordinates53.4549523Β°N, 2.28467Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID9123
Mounting Type for SolarRoof

πŸ“… Project Timeline

2021-05-13