Merlin Diesel Systems 189-191 Bradkirk Place Walton Summit Industrial Estate Bamber Bridge, Lancashire, PR5 8AJ
Merlin Diesel Systems, Bradkirk Place - Solar Panels is a 0.27 MW solar farm project in North West. The applicant or operator on record is Merlin Diesel Systems. The scheme is currently in the planning system, submitted May 2026. The determining authority is South Ribble, referenβ¦
In Planning
Project stageIn planning
PlanningMay 2026 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated date not supplied.
Registered planning capacity; not measured generation.
Merlin Diesel Systems, Bradkirk Place - Solar Panels is a 0.27 MW solar farm project in North West. The applicant or operator on record is Merlin Diesel Systems. The scheme is currently in the planning system, submitted May 2026. The determining authority is South Ribble, reference 07/2026/00377/SPD.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.270 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Merlin Diesel Systems
Owner / operator
Merlin Diesel Systems
Location
Merlin Diesel Systems 189-191 Bradkirk Place Walton Summit Industrial Estate Bamber Bridge, Lancashire, PR5 8AJ