π Project Overview
Mere Flats Solar Farm is a 16 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is NextPower UK. The scheme is currently in the planning system, submitted August 2022. The determining authority is Doncaster, reference 22/01978/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 16 MW |
| Battery chemistry | Co-located with RE |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | NextPower UK |
| Owner / operator | NextPower UK |
| Location | Moor Lane Micklebring, South Yorkshire, S66 7RN |
| Region | Yorkshire and Humber |
| Coordinates | 53.4403399Β°N, 1.22919Β°W |