Merchant House Warehouse, 21 Tyne Dock, West Side, South Shields, Tyne And Wear, NE34 9PY
Merchant House Warehouse, Tyne Dock - Solar Photovoltaics Equipment is a 0.69 MW solar farm project in North East. The applicant or operator on record is Port Of Tyne. Planning permission has been granted as of November 2023 and it is awaiting construction. The determining authorβ¦
Consented / Approved
Project stageConsented
PlanningSep 2023 (completed)
ConsentedNov 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-12-05.
Registered planning capacity; not measured generation.
Merchant House Warehouse, Tyne Dock - Solar Photovoltaics Equipment is a 0.69 MW solar farm project in North East. The applicant or operator on record is Port Of Tyne. Planning permission has been granted as of November 2023 and it is awaiting construction. The determining authority is South Tyneside, reference ST/0714/23/SPVPN.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.690 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Port Of Tyne
Owner / operator
Port Of Tyne
Year consented
2023
Location
Merchant House Warehouse, 21 Tyne Dock, West Side, South Shields, Tyne And Wear, NE34 9PY