Meadows Road, Manvers - Solar Array is a 2.14 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Hyperion Zero Limited. The scheme is currently in the planning system, submitted February 2022. The determining authority is Rotherham, reference RB2022/0252.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 2 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Hyperion Zero Limited |
| Owner / operator | Hyperion Zero Limited |
| Location | Cepac Ltd Meadows Road Manvers, South Yorkshire, S63 5DJ |
| Region | Yorkshire and Humber |
| Coordinates | 53.5098095Β°N, 1.3316133Β°W |