234- 262 Maybank Road, South Woodford, London, E18 1ET
Maybank Road - Solar Panels is a 0.16 MW solar farm project in London. The applicant or operator on record is Dewhurst Group Plc. Planning permission has been granted as of August 2025 and it is awaiting construction. The determining authority is Redbridge, reference 2061/25.β¦
Consented / Approved
Project stageConsented
PlanningJul 2025 (completed)
ConsentedAug 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-09-29.
Registered planning capacity; not measured generation.
Maybank Road - Solar Panels is a 0.16 MW solar farm project in London. The applicant or operator on record is Dewhurst Group Plc. Planning permission has been granted as of August 2025 and it is awaiting construction. The determining authority is Redbridge, reference 2061/25.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.160 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Dewhurst Group Plc
Owner / operator
Dewhurst Group Plc
Year consented
2025
Location
234- 262 Maybank Road, South Woodford, London, E18 1ET