Marsh Farm, Fobbing - Solar Arrays & Battery Storage is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Rayleigh Green Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Thurrock, reference 23/00847/FUβ¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2023 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-06-06.
Registered planning capacity; not measured generation.
Marsh Farm, Fobbing - Solar Arrays & Battery Storage is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is Rayleigh Green Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Thurrock, reference 23/00847/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.