Marr Hall Farm, Barnsley Road, Marr, Doncaster, South Yorkshire, DN5 7AT
Marr Hall Farm, Barnsley Road - Solar Farm is a 40 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Enviromena Asset Management UK Limited. The planning application was refused. The determining authority is Doncaster, reference 23/02634/FULM.β¦
Refused
Project stageRefused
PlanningJan 2024 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2026-01-26.
Registered planning capacity; not measured generation.
Marr Hall Farm, Barnsley Road - Solar Farm is a 40 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Enviromena Asset Management UK Limited. The planning application was refused. The determining authority is Doncaster, reference 23/02634/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
40.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Enviromena Asset Management UK Limited
Owner / operator
Enviromena Asset Management UK Limited
Location
Marr Hall Farm, Barnsley Road, Marr, Doncaster, South Yorkshire, DN5 7AT