Solar Farm

Marr Hall Farm, Barnsley Road - Solar Farm

Marr Hall Farm, Barnsley Road, Marr, Doncaster, South Yorkshire, DN5 7AT

Marr Hall Farm, Barnsley Road - Solar Farm is a 40 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Enviromena Asset Management UK Limited. The planning application was refused. The determining authority is Doncaster, reference 23/02634/FULM.…

Refused
Project stageRefused
  1. PlanningJan 2024 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2026-01-26.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

40.000 MW
Registered Capacity

πŸ“‹ Project Overview

Marr Hall Farm, Barnsley Road - Solar Farm is a 40 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Enviromena Asset Management UK Limited. The planning application was refused. The determining authority is Doncaster, reference 23/02634/FULM.

Site Schematic

SUBSTATION ? ha Β· 40 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)40.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEnviromena Asset Management UK Limited
Owner / operatorEnviromena Asset Management UK Limited
LocationMarr Hall Farm, Barnsley Road, Marr, Doncaster, South Yorkshire, DN5 7AT
RegionYorkshire and Humber
Coordinates53.5414806Β°N, 1.2222992Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)773700

πŸ“… Project Timeline

2024-01-15