Mapperton Farm is a 24 MW solar farm project in South West. The applicant or operator on record is Good Energy Generation. The application has been withdrawn or the scheme abandoned. The determining authority is Dorset, reference 3/13/0681/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJul 2013 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2018-07-03.
Registered planning capacity; not measured generation.
Mapperton Farm is a 24 MW solar farm project in South West. The applicant or operator on record is Good Energy Generation. The application has been withdrawn or the scheme abandoned. The determining authority is Dorset, reference 3/13/0681/FUL.