Site B, Vector 2, Newton Road, Northgate, Crawley, West Sussex, RH10 9TU
Manor Royal, Rowfant - Solar PV Array is a 0.27 MW solar farm project in South East. The applicant or operator on record is Vodafone Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Crawley, reference CR/2021/0573/192.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningOct 2021 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2021-10-11.
Registered planning capacity; not measured generation.
Manor Royal, Rowfant - Solar PV Array is a 0.27 MW solar farm project in South East. The applicant or operator on record is Vodafone Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Crawley, reference CR/2021/0573/192.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.270 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Vodafone Limited
Owner / operator
Vodafone Limited
Location
Site B, Vector 2, Newton Road, Northgate, Crawley, West Sussex, RH10 9TU