Land East of Manor Farm Wadswick Box Corsham, Wiltshire, SN13 8JB
Manor Farm (Wiltshire) is a 9.6 MW solar farm project in South West. The applicant or operator on record is RB & T Barton Ltd. The scheme is currently in the planning system, submitted September 2013. The determining authority is Wiltshire, reference 13/04055/FUL.β¦
Revised
Project stageSuperseded by a new application
PlanningSep 2013 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2014-02-07.
Registered planning capacity; not measured generation.
Manor Farm (Wiltshire) is a 9.6 MW solar farm project in South West. The applicant or operator on record is RB & T Barton Ltd. The scheme is currently in the planning system, submitted September 2013. The determining authority is Wiltshire, reference 13/04055/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
9.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
RB & T Barton Ltd
Owner / operator
RB & T Barton Ltd
Location
Land East of Manor Farm Wadswick Box Corsham, Wiltshire, SN13 8JB