Land to the East of Church Street, Thriplow, Cambridgeshire
Manor Farm is a 14 MW solar farm project in Eastern. The applicant or operator on record is Thriplow Farms. The planning application was refused. The determining authority is South Cambridgeshire, reference S/1687/14/FL.β¦
Refused
Project stageRefused
PlanningAug 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2014-10-02.
Registered planning capacity; not measured generation.
Manor Farm is a 14 MW solar farm project in Eastern. The applicant or operator on record is Thriplow Farms. The planning application was refused. The determining authority is South Cambridgeshire, reference S/1687/14/FL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
14.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Thriplow Farms
Owner / operator
Thriplow Farms
Location
Land to the East of Church Street, Thriplow, Cambridgeshire