The Victoria And Albert Hotel Water Street, Greater Manchester, M3 4JQ
Manchester Marriott Victoria And Albert Hotel - Solar Panels is a 0.17 MW solar farm project in North West. The applicant or operator on record is Marriott Hotels. The application has been withdrawn or the scheme abandoned. The determining authority is Manchester, reference 13844β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2023 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedJun 2024 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2024-07-08.
Registered planning capacity; not measured generation.
Manchester Marriott Victoria And Albert Hotel - Solar Panels is a 0.17 MW solar farm project in North West. The applicant or operator on record is Marriott Hotels. The application has been withdrawn or the scheme abandoned. The determining authority is Manchester, reference 138448/FO/2023.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.170 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Marriott Hotels
Owner / operator
Marriott Hotels
Year consented
2024
Location
The Victoria And Albert Hotel Water Street, Greater Manchester, M3 4JQ