Solar Farm

Manchester Marriott Victoria And Albert Hotel - Solar Panels

The Victoria And Albert Hotel Water Street, Greater Manchester, M3 4JQ

Manchester Marriott Victoria And Albert Hotel - Solar Panels is a 0.17 MW solar farm project in North West. The applicant or operator on record is Marriott Hotels. The application has been withdrawn or the scheme abandoned. The determining authority is Manchester, reference 13844…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningDec 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJun 2024 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2024-07-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.170 MW
Registered Capacity

πŸ“‹ Project Overview

Manchester Marriott Victoria And Albert Hotel - Solar Panels is a 0.17 MW solar farm project in North West. The applicant or operator on record is Marriott Hotels. The application has been withdrawn or the scheme abandoned. The determining authority is Manchester, reference 138448/FO/2023.

Site Schematic

SUBSTATION ? ha Β· 0.17 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.170 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMarriott Hotels
Owner / operatorMarriott Hotels
Year consented2024
LocationThe Victoria And Albert Hotel Water Street, Greater Manchester, M3 4JQ
RegionNorth West
Coordinates53.4795358Β°N, 2.2569289Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)1911

πŸ“… Project Timeline

2023-12-01
2024-06-25