Manchester Communication Academy 2A Silchester Drive, Greater Manchester, M40 8NT
Manchester Communication Academy, Silchester Drive - Solar Panels is a 0.26 MW solar farm project in North West. The applicant or operator on record is Energy Intelligence Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The deteβ¦
Consented / Approved
Project stageConsented
PlanningAug 2023 (completed)
ConsentedSep 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-09-29.
Registered planning capacity; not measured generation.
Manchester Communication Academy, Silchester Drive - Solar Panels is a 0.26 MW solar farm project in North West. The applicant or operator on record is Energy Intelligence Limited. Planning permission has been granted as of September 2023 and it is awaiting construction. The determining authority is Manchester, reference 136761/P14J/2023.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.260 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Energy Intelligence Limited
Owner / operator
Energy Intelligence Limited
Year consented
2023
Location
Manchester Communication Academy 2A Silchester Drive, Greater Manchester, M40 8NT