πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Maltby Solar Farm

North Of Stainton Lane At Maltby Colliery Stainton, South Yorkshire, S65 1AF

Maltby Solar Farm is a 20 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Infinis Energy Services Limited. The scheme is currently in the planning system, submitted August 2025. The determining authority is Rotherham, reference 25/01554/FULM.…

In Planning
Project stageIn planning
  1. PlanningAug 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-08-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

20.000 MW
Registered Capacity

πŸ“‹ Project Overview

Maltby Solar Farm is a 20 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Infinis Energy Services Limited. The scheme is currently in the planning system, submitted August 2025. The determining authority is Rotherham, reference 25/01554/FULM.

Site Schematic

SUBSTATION ? ha Β· 20 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)20.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperInfinis Energy Services Limited
Owner / operatorInfinis Energy Services Limited
LocationNorth Of Stainton Lane At Maltby Colliery Stainton, South Yorkshire, S65 1AF
RegionYorkshire and Humber
Coordinates53.4310799Β°N, 1.354823Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID17104
Mounting Type for SolarGround
Solar Site Area (sqm)177600

πŸ“… Project Timeline

2025-08-01