π Project Overview
Malice Farm, French Drove - Solar Farm is a 49.9 MW solar farm project in Eastern. The applicant or operator on record is FRV TH Powertek Limited. The scheme is currently in the planning system, submitted August 2025. The determining authority is Peterborough, reference 25/01028/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 50 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | FRV TH Powertek Limited |
| Owner / operator | FRV TH Powertek Limited |
| Location | Malice Farm, S/O French Drove And E/O & W/O Scolding Drove, Thorney, Peterborough, Cambridgeshire, PE6 0PP |
| Region | Eastern |
| Coordinates | 52.6641809Β°N, 0.0326036Β°W |