Mains Of Keithick Farm, Keithick, Blairgowrie, Tayside, PH13 9NF
Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm is a 20.5 MW solar farm project in Scotland. The applicant or operator on record is EcoDev Group Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authorβ¦
Consented / Approved
Project stageConsented
PlanningJul 2022 (completed)
ConsentedMar 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-02-19.
Registered planning capacity; not measured generation.
Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm is a 20.5 MW solar farm project in Scotland. The applicant or operator on record is EcoDev Group Limited. Planning permission has been granted as of March 2025 and it is awaiting construction. The determining authority is Scottish Government (S36), reference ECU00004521.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
EcoDev Group Limited
Owner / operator
EcoDev Group Limited
Year consented
2025
Location
Mains Of Keithick Farm, Keithick, Blairgowrie, Tayside, PH13 9NF