Solar Farm

Mains Of Haulkerton - Solar Panels

Mains Of Haulkerton, Grampian, AB30 1EL

Mains Of Haulkerton - Solar Panels is a 0.15 MW solar farm project in Scotland. The applicant or operator on record is Oatmeal Of Alford Limited. Planning permission has been granted as of June 2022 and it is awaiting construction. The determining authority is Aberdeenshire, refe…

Consented / Approved
Project stageConsented
  1. PlanningMay 2022 (completed)
  2. ConsentedJun 2022 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2022-05-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.150 MW
Registered Capacity

πŸ“‹ Project Overview

Mains Of Haulkerton - Solar Panels is a 0.15 MW solar farm project in Scotland. The applicant or operator on record is Oatmeal Of Alford Limited. Planning permission has been granted as of June 2022 and it is awaiting construction. The determining authority is Aberdeenshire, reference APP/2022/1042.

Site Schematic

SUBSTATION ? ha Β· 0.15 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.150 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperOatmeal Of Alford Limited
Owner / operatorOatmeal Of Alford Limited
Year consented2022
LocationMains Of Haulkerton, Grampian, AB30 1EL
RegionScotland
Coordinates56.8461881Β°N, 2.473966Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)780

πŸ“… Project Timeline

2022-05-05
2022-06-10