Mains Of Collithie is a 2.4 MW onshore wind project in Scotland. The applicant or operator on record is Muirden Energy. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2014/1032.…

Refused
Project stageRefused
  1. PlanningMar 2014 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2014-11-06.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.400 MW
Registered Capacity

πŸ“‹ Project Overview

Mains Of Collithie is a 2.4 MW onshore wind project in Scotland. The applicant or operator on record is Muirden Energy. The planning application was refused. The determining authority is Aberdeenshire, reference APP/2014/1032.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.400 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMuirden Energy
Owner / operatorMuirden Energy
LocationLand To South West Of Mains Of Collithie Gartly Huntly, Grampian, AB54 4PW
RegionScotland
Coordinates57.400946Β°N, 2.8225458Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)0.8
No. of Turbines3

πŸ“… Project Timeline

2014-03-05