π Project Overview
Main Street, Kelham - Solar Farm & Battery Energy Storage is a 50 MW battery storage project in East Midlands. The applicant or operator on record is Assured Asset Solar 2 Limited (Peridot Solar). Planning permission has been granted and it is awaiting construction. The determining authority is Newark and Sherwood, reference 23/01837/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 50 MW |
| Battery chemistry | Co-located with RE |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Assured Asset Solar 2 Limited (Peridot Solar) |
| Owner / operator | Assured Asset Solar 2 Limited (Peridot Solar) |
| Location | The W/O Main Street, Kelham, Newark, Nottinghamshire, NG23 5QP |
| Region | East Midlands |
| Coordinates | 53.093458Β°N, 0.8468683Β°W |