Magnetic Park Energy Centre

Desborough, Northamptonshire, Northamptonshire

Magnetic Park Energy Centre is a 8 MW other registered technology project in East Midlands. The applicant or operator on record is Origin Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is North Northamptonshire, reference 1…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningMay 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedNov 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-03-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.000 MW
Registered Capacity

πŸ“‹ Project Overview

Magnetic Park Energy Centre is a 8 MW other registered technology project in East Midlands. The applicant or operator on record is Origin Renewable Energy. The application has been withdrawn or the scheme abandoned. The determining authority is North Northamptonshire, reference 12/00043/WASFUL.

πŸ”§ Technical Specifications

Capacity (MW)8.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperOrigin Renewable Energy
Owner / operatorOrigin Renewable Energy
Year consented2012
LocationDesborough, Northamptonshire, Northamptonshire
RegionEast Midlands
Coordinates52.4503431Β°N, 0.8270215Β°W

Additional published register fields

Registered technologyAdvanced Conversion Technologies

πŸ“… Project Timeline

2012-05-25
2012-11-20