Land between Maerdy Coal Tip and Tynewydd Forest, Mid Glamorgan
Maerdy extension is a 3 MW onshore wind project in Wales. The applicant or operator on record is Greencoat UK Wind. The application has been withdrawn or the scheme abandoned. The determining authority is Rhondda Cynon Taf, reference 14/0556/10.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMay 2014 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedDec 2014 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2015-05-22.
Registered planning capacity; not measured generation.
Maerdy extension is a 3 MW onshore wind project in Wales. The applicant or operator on record is Greencoat UK Wind. The application has been withdrawn or the scheme abandoned. The determining authority is Rhondda Cynon Taf, reference 14/0556/10.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
3.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Greencoat UK Wind
Owner / operator
Greencoat UK Wind
Year consented
2014
Location
Land between Maerdy Coal Tip and Tynewydd Forest, Mid Glamorgan