M.H.Poskitt, Weeland Road, Kellington, Goole, East Riding of Yorkshire, DN14 0FL
M.H.Poskitt, Weeland Road - Solar Panels is a 0.3 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is M H Poskitt Limited. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is Nortβ¦
Consented / Approved
Project stageConsented
PlanningSep 2025 (completed)
ConsentedNov 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-01-02.
Registered planning capacity; not measured generation.
M.H.Poskitt, Weeland Road - Solar Panels is a 0.3 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is M H Poskitt Limited. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is North Yorkshire, reference ZG2025/0843/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
M H Poskitt Limited
Owner / operator
M H Poskitt Limited
Year consented
2025
Location
M.H.Poskitt, Weeland Road, Kellington, Goole, East Riding of Yorkshire, DN14 0FL