Solar Farm

M.H.Poskitt, Weeland Road - Solar Panels

M.H.Poskitt, Weeland Road, Kellington, Goole, East Riding of Yorkshire, DN14 0FL

M.H.Poskitt, Weeland Road - Solar Panels is a 0.3 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is M H Poskitt Limited. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is Nort…

Consented / Approved
Project stageConsented
  1. PlanningSep 2025 (completed)
  2. ConsentedNov 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-01-02.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.300 MW
Registered Capacity

πŸ“‹ Project Overview

M.H.Poskitt, Weeland Road - Solar Panels is a 0.3 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is M H Poskitt Limited. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is North Yorkshire, reference ZG2025/0843/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.3 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperM H Poskitt Limited
Owner / operatorM H Poskitt Limited
Year consented2025
LocationM.H.Poskitt, Weeland Road, Kellington, Goole, East Riding of Yorkshire, DN14 0FL
RegionYorkshire and Humber
Coordinates53.7126507Β°N, 1.1665559Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)1317

πŸ“… Project Timeline

2025-09-16
2025-11-28