Lygan Uchaf Farm, Wern Road, Rhosesmor, Mold CH7 6PY, Clwyd
Lygan Uchaf Farm Wind Turbine is a 1.3 MW onshore wind project in Wales. The applicant or operator on record is ReSence. The planning application was refused. The determining authority is Flintshire, reference 52344.β¦
Refused
Project stageRefused
PlanningJul 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2015-05-07.
Registered planning capacity; not measured generation.
Lygan Uchaf Farm Wind Turbine is a 1.3 MW onshore wind project in Wales. The applicant or operator on record is ReSence. The planning application was refused. The determining authority is Flintshire, reference 52344.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
1.300 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
ReSence
Owner / operator
ReSence
Location