Signature Flight FBO Hangar President Way Luton, Bedfordshire, LU2 9NW
Luton Airport, President Way - Solar PV Panels is a 0.48 MW solar farm project in Eastern. The applicant or operator on record is EvoEnergy Limited. Planning permission has been granted as of August 2022 and it is awaiting construction. The determining authority is Luton, referenβ¦
Consented / Approved
Project stageConsented
PlanningJun 2022 (completed)
ConsentedAug 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-06-20.
Registered planning capacity; not measured generation.
Luton Airport, President Way - Solar PV Panels is a 0.48 MW solar farm project in Eastern. The applicant or operator on record is EvoEnergy Limited. Planning permission has been granted as of August 2022 and it is awaiting construction. The determining authority is Luton, reference 22/00733/PAOSPE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.480 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
EvoEnergy Limited
Owner / operator
EvoEnergy Limited
Year consented
2022