Water Treatment Works Storrs Bridge Lane, South Yorkshire, S6 6SX
Loxley Waste Water Treatment Work,Storrs Bridge Lane - Solar Panels is a 0.56 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Downing Renewable Developments. The planning application was refused. The determining authority is Sheffield, refereβ¦
Refused
Project stageRefused
PlanningJun 2023 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2023-09-11.
Registered planning capacity; not measured generation.
Loxley Waste Water Treatment Work,Storrs Bridge Lane - Solar Panels is a 0.56 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Downing Renewable Developments. The planning application was refused. The determining authority is Sheffield, reference 23/01792/LD2.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.560 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Downing Renewable Developments
Owner / operator
Downing Renewable Developments
Location
Water Treatment Works Storrs Bridge Lane, South Yorkshire, S6 6SX