Lowtown Road, Waringstown - Wind Turbine

120 Metres North East of No. 44A Lowtown Road, Waringstown, Co Armagh, BT66 7SJ

Lowtown Road, Waringstown - Wind Turbine is a 0.85 MW onshore wind project in Northern Ireland. The applicant or operator on record is Slurrykat Limited. The scheme is currently in the planning system, submitted November 2023. The determining authority is Armagh City, Banbridge …

In Planning
Project stageIn planning
  1. PlanningNov 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2026-05-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.850 MW
Registered Capacity

πŸ“‹ Project Overview

Lowtown Road, Waringstown - Wind Turbine is a 0.85 MW onshore wind project in Northern Ireland. The applicant or operator on record is Slurrykat Limited. The scheme is currently in the planning system, submitted November 2023. The determining authority is Armagh City, Banbridge and Craigavon, reference LA08/2023/3134/F.

Site Schematic

NORTHERN IRELAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.850 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSlurrykat Limited
Owner / operatorSlurrykat Limited
Location120 Metres North East of No. 44A Lowtown Road, Waringstown, Co Armagh, BT66 7SJ
RegionNorthern Ireland
Coordinates54.4025435Β°N, 6.3153458Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)0.85
No. of Turbines1
Height of Turbines (m)50

πŸ“… Project Timeline