Lower Thura is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Lower Thura Renewables. The planning application was refused. The determining authority is Highland, reference 16/00268/FUL.…

Refused
Project stageRefused
  1. PlanningJan 2016 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2016-11-01.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.600 MW
Registered Capacity

πŸ“‹ Project Overview

Lower Thura is a 4.6 MW onshore wind project in Scotland. The applicant or operator on record is Lower Thura Renewables. The planning application was refused. The determining authority is Highland, reference 16/00268/FUL.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)4.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLower Thura Renewables
Owner / operatorLower Thura Renewables
LocationLower Thura, Bower, Wick, Highlands, Scotland, Highland, KW1 4TP
RegionScotland
Coordinates58.5423752Β°N, 3.2860784Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2.3
No. of Turbines2
Height of Turbines (m)93

πŸ“… Project Timeline

2016-01-19