Lower road, Garsington - Energy Storage System is a 100 MW battery storage project in South East. The applicant or operator on record is Net Zero Twenty One Ltd. The planning application was refused. The determining authority is South Oxfordshire, reference P24/S3557/FUL.β¦
Refused
Project stageRefused
PlanningNov 2024 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2025-10-07.
Registered planning capacity; not measured generation.
Lower road, Garsington - Energy Storage System is a 100 MW battery storage project in South East. The applicant or operator on record is Net Zero Twenty One Ltd. The planning application was refused. The determining authority is South Oxfordshire, reference P24/S3557/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.