Solar Farm

Lower Heath Farm, Lower Heath - Solar Panels

Lower Heath Farm, Lower Heath, Prees, Whitchurch, Shropshire, SY13 2BQ

Lower Heath Farm, Lower Heath - Solar Panels is a 0.56 MW solar farm project in West Midlands. The applicant or operator on record is Alan Simpson Farming Limited. Planning permission has been granted as of June 2025 and it is awaiting construction. The determining authority is S…

Consented / Approved
Project stageConsented
  1. PlanningMay 2025 (completed)
  2. ConsentedJun 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-07-25.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.560 MW
Registered Capacity

πŸ“‹ Project Overview

Lower Heath Farm, Lower Heath - Solar Panels is a 0.56 MW solar farm project in West Midlands. The applicant or operator on record is Alan Simpson Farming Limited. Planning permission has been granted as of June 2025 and it is awaiting construction. The determining authority is Shropshire, reference 25/01785/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.56 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.560 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAlan Simpson Farming Limited
Owner / operatorAlan Simpson Farming Limited
Year consented2025
LocationLower Heath Farm, Lower Heath, Prees, Whitchurch, Shropshire, SY13 2BQ
RegionWest Midlands
Coordinates52.8872801Β°N, 2.6305589Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)9100

πŸ“… Project Timeline

2025-05-23
2025-06-25