πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Lower Ellenden Farm, Water Lane - Solar Panels

Lower Ellenden Farm, Water Lane, Hawkhurst, Cranbrook, Kent, TN18 5AX

Lower Ellenden Farm, Water Lane - Solar Panels is a solar farm project in South East. The applicant or operator on record is RNA Energy Limited. The planning application was refused. The determining authority is Tunbridge Wells, reference 24/01768/FULL.…

Refused
Project stageRefused
  1. PlanningJul 2024 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2025-05-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

πŸ“‹ Project Overview

Lower Ellenden Farm, Water Lane - Solar Panels is a solar farm project in South East. The applicant or operator on record is RNA Energy Limited. The planning application was refused. The determining authority is Tunbridge Wells, reference 24/01768/FULL.

Site Schematic

SUBSTATION ? ha Β· MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRNA Energy Limited
Owner / operatorRNA Energy Limited
LocationLower Ellenden Farm, Water Lane, Hawkhurst, Cranbrook, Kent, TN18 5AX
RegionSouth East
Coordinates51.0556964Β°N, 0.5226497Β°E

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Are they re-applying (Old REPD Ref) 14863
Solar Site Area (sqm)148500

πŸ“… Project Timeline

2024-07-18