Lower Ellenden Farm, Water Lane, Hawkhurst, Cranbrook, Kent, TN18 5AX
Lower Ellenden Farm, Water Lane - Solar Panels is a 6 MW solar farm project in South East. The applicant or operator on record is RNA Energy Limited. The scheme is currently in the planning system, submitted August 2023. The determining authority is Tunbridge Wells, reference 23/β¦
Revised
Project stageSuperseded by a new application
PlanningAug 2023 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2023-12-18.
Registered planning capacity; not measured generation.
Lower Ellenden Farm, Water Lane - Solar Panels is a 6 MW solar farm project in South East. The applicant or operator on record is RNA Energy Limited. The scheme is currently in the planning system, submitted August 2023. The determining authority is Tunbridge Wells, reference 23/02059/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
6.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
RNA Energy Limited
Owner / operator
RNA Energy Limited
Location
Lower Ellenden Farm, Water Lane, Hawkhurst, Cranbrook, Kent, TN18 5AX