π Project Overview
Lower Claverham Farm & Mount Pleasant Farm, Berwick - Solar Farm is a 49.9 MW solar farm project in South East. The applicant or operator on record is Scottish Power Renewables. The planning application was refused. The determining authority is Wealden, reference WD/2021/2617/MEA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 49.900 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Scottish Power Renewables |
| Owner / operator | Scottish Power Renewables |
| Location | N/O Lower Claverham Farm, Berwick, Chalvington, Polegate, East Sussex, BN26 6TJ |
| Region | South East |
| Coordinates | 50.8623625Β°N, 0.176373Β°E |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Ground |
| Solar Site Area (sqm) | 815000 |