Land At Lower Basset Down Farm Hay Lane Bassett Down Swindon, Wiltshire, SN4 9QP
Lower Basset Down Farm is a 10.5 MW solar farm project in South West. The applicant or operator on record is INRG Solar. It is recorded as operational since March 2016. The determining authority is Swindon, reference S/14/0899.β¦
OperationalΒ· Since 2016
Project stageOperating
PlanningJun 2014 (completed)
ConsentedDec 2014 (completed)
ConstructionNov 2015 (completed)
OperatingMar 2016 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2016-03-22.
Registered planning capacity; not measured generation.
Lower Basset Down Farm is a 10.5 MW solar farm project in South West. The applicant or operator on record is INRG Solar. It is recorded as operational since March 2016. The determining authority is Swindon, reference S/14/0899.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.500 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
INRG Solar
Owner / operator
INRG Solar
Year consented
2014
Construction started
2015
Commissioned / target
2016
Location
Land At Lower Basset Down Farm Hay Lane Bassett Down Swindon, Wiltshire, SN4 9QP