π Project Overview
Low Raisby Farm, Kelloe - Solar Panels is a 25.3 MW solar farm project in North East. The applicant or operator on record is ABEI Energy Green II. The scheme is currently in the planning system, submitted January 2026. The determining authority is County Durham, reference DM/26/00070/FPA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 25.300 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | ABEI Energy Green II |
| Owner / operator | ABEI Energy Green II |
| Location | Low Raisby Farm, Kelloe, Durham, County Durham, DH6 4PW |
| Region | North East |
| Coordinates | 54.7172063Β°N, 1.4580958Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Ground |
| Solar Site Area (sqm) | 336000 |