πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Onshore Wind

Lotus Manufacturing

Land at Group Lotus PLC, Potash Lane, Hethel, Wymondham, South Norfolk, Norfolk

Lotus Manufacturing is a 6 MW onshore wind project in Eastern. The applicant or operator on record is Ecotricity. The planning application was refused. The determining authority is South Norfolk, reference 2007/1427.…

Refused
Project stageRefused
  1. PlanningJun 2007 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2011-06-29.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.000 MW
Registered Capacity

πŸ“‹ Project Overview

Lotus Manufacturing is a 6 MW onshore wind project in Eastern. The applicant or operator on record is Ecotricity. The planning application was refused. The determining authority is South Norfolk, reference 2007/1427.

Site Schematic

EASTERN Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)6.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEcotricity
Owner / operatorEcotricity
LocationLand at Group Lotus PLC, Potash Lane, Hethel, Wymondham, South Norfolk, Norfolk
RegionEastern
Coordinates52.5626888Β°N, 1.171358Β°E

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)2
No. of Turbines3

πŸ“… Project Timeline

2007-06-28